Workplace Concepts were commissioned to provide a complete design and project management service for creating a new head office (13,500 sq ft over the 13th, 14th & 15th floors). The general scope of works include:

Due Diligence:

  • Detailed dimensional survey & place building on Auto CAD
  • Mechanical & Electrical validation
  • DDA (Disabled & discrimination audit)

Pre-tender:

  • Develop the Client’s requirements
  • Concept & detailed design
  • Tender packages

Contract:

  • Strip out all finishes and services back to the building shell
  • Build new solid and full height silicon jointed glazed partitions
  • Install new Privilite glass to partition fronts to conference and meeting rooms Install acoustic sliding and folding partition walls
  • New Suspended ceiling and energy efficient modular lighting
  • Form new cellular offices, meeting rooms, boardroom, conference room, reception area, staff breakout and computer room
  • Computer room raised access floor
  • VESDA fire protection system to the computer room
  • Refurbished the existing lift core
  • New elctrical services, including lighting, small power and fire alarms
  • Installed new air conditioning four pipe fancoil system to all floors
  • Install new AHU’s and associated ductwork to provide fresh air throughout the office space
  • Infrastructure voice and data cabling CAT 6 to support VOIP
  • Installation of audio visual equipment to the meeting rooms
  • Comprehensive CCTV and access control systems
  • Floor and wall finishes
  • Procurement and installation of new office furniture including purpose made joinery
  • Office furniture and equipment relocation

Post-contract:

  • Maintenance agreements

Points of interest:

Orion House is occupied by several different tenants so it was essential to ensure that any possible disruption was kept to a minimum, which required out of hours working. The existing air conditioning was a VAV installation which had reached the end of its life expectancy. However the central chillers were only a couple of years old and capable of providing the required duty.

Extensive negotiations were required between Workplace Concepts and the Landlord’s professional team to obtain all necessary approvals.